Press conference: fast raised sports installations
Today “Ruukki” company together with its partners, engineering company “Technoliga” and developer of technological solutions “YIT Elmek” company is starting development of the unique conception of full-set, fast raised sports installations.
“Ruukki” company and its partners have concentrated their efforts on those sports installations, on which the training process is more important:
- ice arenas for hockey (for 400 and 1500 places for spectators),
- swimming pools (4 design constructions, including child’s swimming pool, with the length of swimming lane – 25 and 50 meters),
- universal sports halls.
Important advantage of “Ruukki” project is the fact that building of sports complex can be started right away because of conception and project are already developed.
Other key advantages are:
- speed: 11 month from the beginning until surrender of sports unit which is ready to put it into operation,
- “turn-key-basis” solution: conception is including itself everything: from ice to marble, from system of water-supply to armchairs for spectators and checkrooms,
- price: approximately on 25-30% less than for a similar sports units,
- absence of restriction on geographical indication.
Today “Ruukki” company is the leading supplier of system and complex solutions on the basis of metal on Russian and European building markets, company manufacture each month in average about 70 units of different kinds a and dimensions. Current volume of “Ruukki” production on Russian market is about 12 thousands tons of metal constructions each month. More over, production of front and roof systems is attached to each project.
Based on materials of web-site “Ruukki”: http://www.ruukki-sports.com/release1.html